Web Analytics
Datasheet 搜索 > 电压基准芯片 > ON Semiconductor(安森美) > LM285Z-2.5RAG 数据手册 > LM285Z-2.5RAG 其他数据使用手册 1/20 页
LM285Z-2.5RAG
1.547
导航目录
  • 标记信息在P1
LM285Z-2.5RAG数据手册
Page:
of 20 Go
若手册格式错乱,请下载阅览PDF原文件
Initial Product/Process Change Notification
Document #:IPCN23449X
Issue Date:25 Sep 2020
TEM001790 Rev. C Page 1 of 8
Title of Change:
Assembly and Test Transfer from AUK Dalian, China to JCET CHUZHOU, China for TO92 Products,
Case Outline 29-11 Change for TO92 Products.
Proposed First Ship date:
03 Apr 2021 or earlier if approved by customer
Contact Information:
Contact your local ON Semiconductor Sales Office or Marquita.Jones@onsemi.com
PCN Samples Contact:
Contact your local ON Semiconductor Sales Office or PCN.samples@onsemi.com
Sample requests are to be submitted no later than 30 days from the date of first notification,
Initial PCN or Final PCN, for this change.
Samples delivery timing will be subject to request date, sample quantity and special customer
packing/label requirements.
Type of Notification:
This is an Initial Product/Process Change Notification (IPCN) sent to customers. An IPCN is an
advance notification about an upcoming change and contains general information regarding the
change details and devices affected. It also contains the preliminary reliability qualification
plan.The completed qualification and characterization data will be included in the Final
Product/Process Change Notification (FPCN). This IPCN notification will be followed by a Final
Product/Process Change Notification (FPCN) at least 90 days prior to implementation of the
change. In case of questions, contact PCN.Support@onsemi.com
Marking of Parts/ Traceability of
Change:
Product marked with date code PM (YW) or later may be built from current factory or from
JCET. On the label of the box and reel, the ASSY LOC: JC will also indicate product assembled in
JCET. Please see sample label on Page 2 at the following URL
http://www.onsemi.com/pub/Collateral/LABELRM‐D.PDF to see the location of the ASSY LOC.
Change Category:
Test Change, Assembly Change
Change Sub-Category(s):
Material Change, Manufacturing Site Transfer
Sites Affected:
ON Semiconductor Sites
External Foundry/Subcon Sites
None
AUK Dalian, China
JCET, China
Description and Purpose:
ON Semiconductor would like to inform customers of the intent to transfer assembly and test for the TO92 products listed in this notification from
the current site, AUK Dalian, China to JCET CHUZHOU, China. BOM (Bill of Materials) changes are listed below:
Before Change Description
After Change Description
PMC90-1/2H
LF TO92L 3L CuAg STAMPED
ABLE843-001
DAD-87
EME-E120G
EMG200
ON Semiconductor would also like to inform customers of the intent to update case outline 29-11 for the TO92 products listed in this notification.
The changes are listed below:

LM285Z-2.5RAG 数据手册

ON Semiconductor(安森美)
2 页 / 0.15 MByte
ON Semiconductor(安森美)
13 页 / 0.21 MByte
ON Semiconductor(安森美)
20 页 / 2.24 MByte
ON Semiconductor(安森美)
3 页 / 0.05 MByte
ON Semiconductor(安森美)
2 页 / 0.15 MByte

LM285Z25 数据手册

ON Semiconductor(安森美)
ON Semiconductor(安森美)
ON Semiconductor(安森美)
器件 Datasheet 文档搜索
器件加载中...
AiEMA 数据库涵盖高达 72,405,303 个元件的数据手册,每天更新 5,000 多个 PDF 文件