Datasheet 搜索 > 接口芯片 > ST Microelectronics(意法半导体) > ST3232BTR 数据手册 > ST3232BTR 产品修订记录 1/3 页


¥ 2.193
ST3232BTR 产品修订记录 - ST Microelectronics(意法半导体)
制造商:
ST Microelectronics(意法半导体)
分类:
接口芯片
封装:
TSSOP-16
描述:
STMICROELECTRONICS ST3232BTR 芯片, 收发器, 400KBPS, RS-232, TSSOP-16
Pictures:
3D模型
符号图
焊盘图
引脚图
产品图
页面导航:
标记信息在P1
导航目录
ST3232BTR数据手册
Page:
of 3 Go
若手册格式错乱,请下载阅览PDF原文件

PRODUCT / PROCESS CHANGE INFORMATION
1. PCI basic data
1.1 Company STMicroelectronics International N.V
1.2 PCI No. CRP/19/11361
1.3 Title of PCI LAX Hub move preparation
1.4 Product Category Not applicable as the change is related to HUB move and not related to Products
1.5 Issue date 2019-02-27
2. PCI Team
2.1 Contact supplier
2.1.1 Name FRANK SCHIFANO
2.1.2 Phone +1 5148333778
2.1.3 Email frank.schifano@st.com
2.2 Change responsibility
2.2.1 Process Owner Karim BILAL
2.1.2 Corporate Quality Manager Gerard PETIT
3. Change
3.1 Category 3.2 Type of change 3.3 Manufacturing Location
General (Logistic) New location (hub, warehouse…) LAX DC
4. Description of change
Old New
4.1 Description LSP: Ceva Logistics
Operation Services: Brokerage, Airline
Recovery, Foreign Trade Zone, Crossdock,
Export Processing
Location: Torrance, CA
Operating SQF: 13,000
Working areas Temperature, Humidity and Lux
calibrated according to ST Logistics standards.
LSP: Geodis or DSV Air & Sea
Operation Services: Brokerage, Airline
Recovery, Foreign Trade Zone, Bonded
Transfer, Export Processing, Duty Drawback
Location: Carson, CA
Operating SQF: 13,000
Working areas Temperature, Humidity and Lux
calibrated according to ST Logistics standards.
4.2 Anticipated Impact on form,fit,
function, quality, reliability or
processability?
- Form: No change on product
- Fit: No change on product
- Function: No change on product.
- Reliability, or Processability: NA (Not applicable).
5. Reason / motivation for change
5.1 Motivation Transferring LAX HUB operations to new Logistics Service Provider in Carson, CA from Ceva
Logistics in Torrance, CA. The change also includes personnel, location, logistic model and the
transfer of equipment, workstations, and inventories.
The reason for the change is that the current agreement is ending, and the business has been
awarded to a new Logistics Service Provider.
5.2 Customer Benefit SERVICE CONTINUITY
6. Marking of parts / traceability of change
6.1 Description NA
7. Timing / schedule
7.1 Date of qualification results 2019-04-01
7.2 Intended start of delivery 2019-04-01
7.3 Qualification sample available? Not Applicable
器件 Datasheet 文档搜索
AiEMA 数据库涵盖高达 72,405,303 个元件的数据手册,每天更新 5,000 多个 PDF 文件